Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18FO0078

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18FO0078","CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG CABILOGAN RIVER, GUINOBATAN, ALBAY","Flood Control and Drainage","Completed",92604962.9,0,100,"Albay 3rd DEO","Region V","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2018-06-25","2019-01-13",2018,"Regular Infra - GAA 2018 OO-2",13.2122,123.57763,"500504000","500500000"]
SHA-256
81e1198cb50edfd72499f0f1741eaaf506b5eaff650c7805c2175bdfc20e0af0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.