Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18GF0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GF0021","CONSTRUCTION OF TUMAGBOK FLOOD CONTROL PROJECT, MIAGAO, ILOILO (STATION 0+120 - STATION 0+367)","Flood Control and Drainage","Completed",27479952.46,0,100,"Iloilo 1st DEO","Region VI","IBC INTERNATIONAL BUILDERS CORPORATION (8576)","2018-03-12","2019-02-15",2018,"Regular Infra - GAA 2018 OO-2",10.64355,122.24045,"603030000","603000000"]
SHA-256
15a757c591f17b57aeecfa8a435aab8a194d664de63e6266995d1660fc92f0fd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.