Project 18GF0027
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GF0027","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES, REVETMENT & DRAINAGE SYSTEM OF JAR-AO RIVER, GUIMBAL, ILOILO (BONGOL SAN MIGUEL SECTION)","Flood Control and Drainage","Completed",6925794.91,0,100,"Iloilo 1st DEO","Region VI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2018-05-16","2019-03-01",2018,"Regular Infra - GAA 2018 LP",10.71701,122.30694,"603020000","603000000"]
SHA-256
0ebef0577a6021beac29b6b2a4310444c5358bffa50a32f691e1421feb262807Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.