Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18GF0042

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GF0042","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - GUIMBAL FLOOD CONTROL STRUCTURES (REVETMENT, SCOUR PROTECTION AND ACCESS ROAD), GUIMBAL, ILOILO","Flood Control and Drainage","Completed",75425890.49,0,100,"Iloilo 1st DEO","Region VI","IBC INTERNATIONAL BUILDERS CORPORATION (8576)","2018-04-03","2019-08-01",2018,"Regular Infra - GAA 2018 OO-2",10.66255,122.31933,"603020000","603000000"]
SHA-256
5fab06a787846cd6a65cdc9256da3ea10a570c020105460f5e58b7da1ef2af4b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.