Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18GG0211

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GG0211","CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY - TWO (2) REGULAR WORKSHOP BUILDING, MALUSGOD NATIONAL HIGH SCHOOL (BATCH 3), DUEÑAS, ILOILO","Buildings and Facilities","Terminated",3178060.54,0,100,"Iloilo 2nd DEO","Region VI","KENBE CONSTRUCTION & SUPPLY (34290)","2018-12-18","2020-07-08",2018,"Outside Infra - GAA 2018 DepEd BEFF",11.02552,122.5815,"603017000","603000000"]
SHA-256
29eb96083015ad33f46e5af03d729a6c06bc0f87687d9eec31590dbf55570c45

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.