Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18GG0219

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GG0219","CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY FOUR (4) CLASSROOMS, CARVASANA NATIONAL HIGH SCHOOL (BATCH 3), CALINOG, ILOILO","Buildings and Facilities","Completed",9326751.6,0,100,"Iloilo 2nd DEO","Region VI","EZ GOLD CONSTRUCTION & SUPPLY (39408)","2018-12-18","2019-08-31",2018,"Outside Infra - GAA 2018 DepEd BEFF",10.89268,122.43524,"603029000","603000000"]
SHA-256
b024d1a9a17aa6d31b8708eb85c8dd07a2a4c9aa495d6754710e29b8caec34cc

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.