Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18GJ0095

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GJ0095","CONSTRUCTION OF FLOOD CONTROL/DRAINAGE, BRGY. DUNGON A, JARO, ILOILO CITY","Flood Control and Drainage","Completed",984850.27,0,100,"Iloilo City DEO","Region VI","V N GRANDE BUILDERS & SUPPLY (32238)","2018-03-19","2018-04-09",2018,"Regular Infra - GAA 2018 LP",10.72694,122.54869,"631000000","603000000"]
SHA-256
17e0ecf1c24fb294cab0e633c2aa879e83a9c46fc4306ba3e36b7728ee263394

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.