Project 18GJ0108
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GJ0108","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION WORKS AND IMPROVEMENT ALONG ILOILO RIVER, RIGHT BANK (FROM MUELLELONEY BRIDGE (RIZAL) TO MUELLELONEY BRIDGE (DRILON BRIDGE)), ILOILO CITY","Flood Control and Drainage","Completed",24499396.39,0,100,"Iloilo City DEO","Region VI","IBC INTERNATIONAL BUILDERS CORPORATION (8576)","2018-03-22","2019-03-12",2018,"Regular Infra - GAA 2018 OO-2",10.69991,122.57056,"631000000","603000000"]
SHA-256
d96a1f06fea4708b898af4eada2fa36f5ba6d522fdb2d8d68311ccf4142488e9Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.