Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18GO0127

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GO0127","CONSTRUCTION OF ONE(1 ) UNIT UNIQUE WORKSHOP ( 7.00M X 22.5M) AT NEGROS OCCIDENTAL HIGH SCHOOL ( BUILDING C), BACOLOD CITY","Buildings and Facilities","Completed",4338322,0,100,"Bacolod City DEO","Negros Island Region","M.K.U. CONSTRUCTION AND SUPPLY (37674)","2018-07-05","2018-10-27",2018,"Outside Infra - GAA 2018 DepEd BEFF",10.66163,122.94377,"1830200000","1804500000"]
SHA-256
14042bc3fd36885e3ffafad7d5fd3a4d967f15b2f0454da367920759f0286fd4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.