Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18GO0140

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GO0140","CONSTRUCTION OF THREE(3) STOREY- SIX(6) LABORATORY ( 2 REGULAR WORKSHOP, 2 SCIENCE LAB & 2 ICT) AT MANSILINGAN AGRO-INDUSTRIAL HIGH SCHOOL, BRGY. MANSILINGAN, BACOLOD CITY","Buildings and Facilities","Completed",27794703.67,0,100,"Bacolod City DEO","Negros Island Region","WILKINSON CONSTRUCTION (21422)","2018-07-20","2019-01-25",2018,"Outside Infra - GAA 2018 DepEd BEFF",10.62908,122.973,"1830200000","1804500000"]
SHA-256
63cdfef66f201d90be2b9d9432daebbab158097501c1857be0bffae28c855b0d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.