Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18GP0032

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18GP0032","CONSTRUCTION OF FLOOD MITIGATON STRUCTURE - CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, POBLACION TABUC, MAMBUSAO, CAPIZ","Flood Control and Drainage","Completed",34569284.49,0,100,"Capiz 2nd DEO","Region VI","F. GURREA CONSTRUCTION, INCORPORATED (6995)","2018-04-06","2019-04-29",2018,"Regular Infra - GAA 2018 OO-2",11.43187,122.60189,"601908000","601900000"]
SHA-256
f979d723d9dfe36048a292e8ba84d2b235ca339ef991289fa683d8cdbe26b26f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.