Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HA0069

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HA0069","REHAB./RECONST. OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE, AND LANDSLIDE-JCT. (TNR)CORTES-BALILIHAN-CATIGBIAN-MACAAS ROAD. K0009+(-090)-K0009+020,K0017+250-K0017+330,K0027+550-K0027+600,K0044+506.580-K0044+521.900,K0045+600-K0045+847","Roads","Completed",3948692,0,100,"Bohol 1st DEO","Region VII","N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)","2018-07-02","2018-10-03",2018,"Regular Infra - GAA 2018 OO-1",9.93524,123.99624,"701245000","701200000"]
SHA-256
2471ffdf5702187d038c29aaca8463de7e2602b8b15493a68188e8ccac47b58f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.