Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HB0025

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HB0025","NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT SECONDARY ROADS - OFF-CARRIAGEWAY IMPROVEMENT SHOULDER PAVING/CONSTRUCTION, LOAY INTERIOR ROAD, K0158+420 - K0159+319, K0159+361-K0169+199, K0160+214 -K0160+730, CARMEN, BOHOL","Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP","Completed",26629492.4,0,100,"Bohol 3rd DEO","Region VII","LEDA  CONSTRUCTION INCORPORATED (12229)","2018-02-20","2018-06-14",2018,"Regular Infra - Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP",9.83473,124.21584,"701212000","701200000"]
SHA-256
5142c8f9849ed159e753061c7f49dd8584d0e2757b3afa45035f0e7b6cde2284

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.