Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HB0044

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HB0044","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/IMPROVEMENT OF SEAWALL, BARANGAY POBLACION, JAGNA, BOHOL","Flood Control and Drainage","Completed",4410000,0,100,"Bohol 3rd DEO","Region VII","J.F. ESTAPIA CONSTRUCTION (40112)","2018-02-27","2018-05-12",2018,"Regular Infra - GAA 2018 OO-2",9.65053,124.37278,"701225000","701200000"]
SHA-256
ec73e7fd5479c76bb32cb6dadf27b061027582111d22ef82e02c4dd022d33be9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.