Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18HM0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18HM0028","CONSTRUCTION OF FLOOD CONTROL STRUCTURES/SHORE PROTECTION AT LOOC - CANTAROC A, MARIA, SIQUIJOR","Flood Control and Drainage","Completed",42696947.51,0,100,"Siquijor DEO","Negros Island Region","A.C. RIVERO DEVELOPMENT CORPORATION (5122)","2018-02-26","2019-05-29",2018,"Regular Infra - GAA 2018 OO-2",9.19269,123.657,"1806104000","1806100000"]
SHA-256
45f0e6c0859dad8a3cbc1f895199c775175f875dd344adf53b1030274326a73c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.