Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18I00013

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18I00013","ROAD WIDENING - PRIMARY ROADS - PALO - CARIGARA - ORMOC ROAD - KO975+061 - KO975+788, KO975+832.20 - KO980+372, KO982+186 - KO983+255, KO940+454 - KO940+895, LEYTE 2ND LD","Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",165515661.68,0,100,"Region VIII","Region VIII","UNIMASTERS CONGLOMERATION, INCORPORATED (3390)","2018-08-14","2020-11-30",2018,"Regular Infra - Roads: Construction - PCCP, Roads: Construction - Slope Protection using Structural Measures (e.g. Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",11.19608,124.78253,"803723000","803700000"]
SHA-256
40a613c780d22194a868ed4aadc78476c8c448177592e9667709ed98cb5b7364

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.