Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18IB0073

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18IB0073","CONSTRUCTION OF BORONGAN FLOOD CONTROL STRUCTURES ALONG LOOM RIVER, BORONGAN CITY, EASTERN SAMAR","Flood Control and Drainage","Completed",67549971.03,0,100,"Eastern Samar DEO","Region VIII","888 ACY ENTERPRISES (32898)","2018-03-06","2018-12-17",2018,"Regular Infra - GAA 2018 OO-2",11.60582,125.43898,"802604000","802600000"]
SHA-256
e4505cf6204c82bf45403c5bf0373271d247f6a5a0636e21b54bd1e3746f7cc2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.