Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18IB0120

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18IB0120","CONSTRUCTION OF HILABAAN, FLOOD CONTROL STRUCTURE, BRGY. HILABAAN, DOLORES, EASTERN SAMAR","Flood Control and Drainage","Completed",9793445.6,0,100,"Eastern Samar DEO","Region VIII","DAYBREAK ENTERPRISES - ENGINEERING & CONSTRUCTION (30174)","2018-04-12","2018-08-23",2018,"Regular Infra - GAA 2018 OO-2",12.03501,125.55932,null,"802600000"]
SHA-256
a940d544df8b99c2f3824298dad6f224d89101c26c0d355c4428bafdc0afbfc5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.