Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18ID0067

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18ID0067","RECONSTRUCTION OF FLOOD CONTROL STRUCTURE PROJECT ALONG BALIRE RIVER,BRGY. SALVACION,          MAC ARTHUR,LEYTE","Flood Control and Drainage","Completed",35040946.03,0,100,"Leyte 2nd DEO","Region VIII","LANOY CONSTRUCTION (35289)","2018-03-08","2018-11-29",2018,"Regular Infra - GAA 2018 OO-2",10.82174,124.92642,"803730000","803700000"]
SHA-256
1c39917355e2dbf663103405e2d09e60ab7348f61f5f6d178a068352f71fd540

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.