Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18II0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18II0028","CONSTRUCTION OF PAMBUJAN RIVER CONTROL, PAMBUJAN RIVER BASIN, PAMBUJAN, NORTHERN SAMAR","Flood Control and Drainage","Completed",36321006.48,0,100,"Northern Samar 2nd DEO","Region VIII","JUPA CONSTRUCTION (23577)","2018-04-06","2018-09-30",2018,"Regular Infra - GAA 2018 OO-2",12.54376,124.90779,"804815000","804800000"]
SHA-256
27f28ec3affdfc950577d54d8df5c0ec562ead2cc99f0a125e82c0f20b4818f5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.