Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18IJ0048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18IJ0048","REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG MAGUINO-O CREEK, BRGY. MAGUINO-O, CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",8550445,0,100,"Samar 1st DEO","Region VIII","JFR CONSTRUCTION INC. (FORMERLY:JFR CONSTRUCTION) (35890)","2018-02-09","2018-05-23",2018,"Regular Infra - GAA 2018 OO-2",12.13891,124.46075,"806003000","806000000"]
SHA-256
20bfbf6c206bbaa451eb05bcff928d8e324691bf6342f2e802af8a6d37ed5157

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.