Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18IJ0056

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18IJ0056","REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG TANGAO RIVER, BRGY. SAN JOAQUIN, CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",26960648.49,0,100,"Samar 1st DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2018-02-09","2018-09-21",2018,"Regular Infra - GAA 2018 OO-2",12.1741,124.42528,"806003000","806000000"]
SHA-256
2baa38a1aaf8a206f6c37d4f32ac50b5d6acb561e4c9c68aa43ea28e59d15013

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.