Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18IJ0065

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18IJ0065","REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG CAGLANIPAO SUR, CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",17717009.17,0,100,"Samar 1st DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2018-03-01","2018-08-12",2018,"Regular Infra - GAA 2018 OO-2",12.28172,124.3574,"806003000","806000000"]
SHA-256
2f738c57cf060a48edffb53488284eeef83c25e8087c161f4bef005444c95fcb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.