Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18IJ0071

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18IJ0071","REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG CAGNIPA RIVER, BRGY. CAGNIPA, CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",18100000,0,100,"Samar 1st DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2018-02-28","2018-08-02",2018,"Regular Infra - GAA 2018 OO-2",12.07085,124.55582,"806003000","806000000"]
SHA-256
6b853d4dccc134523556c365169ffcb453113408e2127737f9e9f6b075d4a54f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.