Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18IJ0155

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18IJ0155","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALBAYOG RIVER, BARANGAY NIJAGA, CALBAYOG CITY, SAMAR","Flood Control and Drainage","Completed",27604120,0,100,"Samar 1st DEO","Region VIII","PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) (6302)","2018-07-16","2018-12-20",2018,"Regular Infra - GAA 2018 OO-2",12.07846,124.60442,"806003000","806000000"]
SHA-256
3f44bcefc5315407a7b26ab8d9a44af44c4e5d96a3ce762c573b719167cdaa3a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.