Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18J00044

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18J00044","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE","Flood Control and Drainage","Completed",101222813.91,0,100,"Region IX","Region IX","UNITEC BUILDER, INCORPORATED (4803)","2018-07-26","2019-05-07",2018,"Regular Infra - GAA 2018 OO-2",7.71107,122.14175,"907219000","907200000"]
SHA-256
bafa3c49786aed9f1d39bcf55eb8967564c0df7aa70aa826670971f9a8e6e21a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.