Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18JF0012

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JF0012","CONSTRUCTION OF LIBERTAD FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER, TUNGAWAN, ZAMBOANGA SIBUGAY","Flood Control and Drainage","Completed",9615455,0,100,"Zamboanga Sibugay 2nd DEO","Region IX","BARILLO CONSTRUCTION AND ENTERPRISES (23836)","2018-03-19","2018-10-07",2018,"Regular Infra - GAA 2018 OO-2",7.60057,122.42811,"908316000","908300000"]
SHA-256
d790538c64284b3bb8b88d90505e4f7bc00ad877c4e5157bc72f1d6d13bb0bf7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.