FY2026 GAA: ₱6.79T
PisoScan

Project 18JF0017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JF0017","CONSTRUCTION OF UPPER TUNGAWAN FLOOD CONTROL STRUCTURE ALONG TUNGAWAN RIVER, TUNGAWAN ZAMBOANGA SIBUGAY","Flood Control and Drainage","Completed",6746043.46,0,100,"Zamboanga Sibugay 2nd DEO","Region IX","LAKEWOOD CONSTRUCTION COMPANY (5294)","2018-08-08","2018-11-03",2018,"Regular Infra - GAA 2018 OO-2",7.53882,122.37776,"908316000","908300000"]
SHA-256
17cf86fcd64729640869a6ee388e7492f21584cb62641b0d3edc0dedad03c0fd