Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18JF0061

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JF0061","CONSTRUCTION OF MULTI-PURPOSE BUILDING (BRGY. HALL), BRGY. BALURAN, TUNGAWAN Z.S","Buildings and Facilities","Completed",1474669.99,0,100,"Zamboanga Sibugay 2nd DEO","Region IX","ST. JOSEPH CONSTRUCTION AND TRADING (36890)","2018-03-16","2018-06-13",2018,"Regular Infra - GAA 2018 LP",7.62635,122.45135,"908316000","908300000"]
SHA-256
52ad14069f598855d75a5e40e3491640709fcbe46c2ba41edfaf4a0b5709bb18

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.