Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18JF0062

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JF0062","CONSTRUCTION OF MULTIPURPOSE BUILDING (BRGY. HALL) BRGY. TAGLIBAS, TUNGAWAN, Z.S","Buildings and Facilities","Completed",1479999.18,0,100,"Zamboanga Sibugay 2nd DEO","Region IX","ST. JOSEPH CONSTRUCTION AND TRADING (36890)","2018-03-16","2018-06-13",2018,"Regular Infra - GAA 2018 LP",7.56192,122.44613,"908316000","908300000"]
SHA-256
73b7d7b2b834e308c3bed8425487f96ea439290a10b25de7e99f831bd5d40288

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.