Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18JF0119

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JF0119","CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS (RAINWATER COLLECTOR SYSTEM), ZAMBOANGA SIBUGAY","Water Provision and Storage","Completed",3236124.31,0,100,"Zamboanga Sibugay 2nd DEO","Region IX","ST. JOSEPH CONSTRUCTION AND TRADING (36890)","2018-11-02","2018-12-08",2018,"Regular Infra - GAA 2018 Other Infrastructure (CSSP)",7.78717,122.59592,"908305000","908300000"]
SHA-256
fa163991c140f090381f86ae8603513f70aad41098ffe599a70c5490c12e85ba

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.