Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18JI0041

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18JI0041","RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES AT UPPER BUYUGAN BR. (B00475MN) ALONG LANAO-PAGADIAN-ZAMBOANGA CITY RD","Bridges","Completed",15053005.21,0,100,"Zamboanga Sibugay 1st DEO","Region IX","O. G. SANTOS CONSTRUCTION (2050)","2018-02-18","2018-07-02",2018,"Regular Infra - GAA 2018 OO-1",7.73625,123.07688,"908302000","908300000"]
SHA-256
41ad1e6fe8699f0e9d9adb2b3d5c6864839224103d7361f858ac736c563251dd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.