Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18KA0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18KA0043","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDON) RD(SALUG BRIDGE), SALUG RIVER, SAN FERNANDO, BUKIDNONSAN FERNANDO, BUKIDNON","Flood Control and Drainage","Completed",19599999.15,0,100,"Bukidnon 1st DEO","Region X","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2018-02-20","2018-09-28",2018,"Regular Infra - GAA 2018 OO-2",7.75529,125.39566,"1001318000","1001300000"]
SHA-256
e1a5d367db9fdb90b42ccbf50d88c81195d0f9a52276fad68c1e045d596a5f9f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.