Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18KG0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18KG0040","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONSTRUCTION OF REVETMENT/RIVER CONTROL ON SHEET PILE ALONG MALABANG-DOBLESTON-TUKURAN ROAD,KAROMATAN BRIDGE,BARANGAY POBLACION,SND,LANAO DEL NORTE","Flood Control and Drainage","Completed",27925702.81,0,100,"Lanao del Norte 2nd DEO","Region X","AL HUSSEIN CONSTRUCTION (18438)","2018-05-03","2018-09-29",2018,"Regular Infra - GAA 2018 OO-2",7.79613,123.72381,"1003506000","1003500000"]
SHA-256
d2700f3c24ea97ec03da78fe1de1f007b8154d6b1b0567d7b4a264d70ecdd80b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.