Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18KI0017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18KI0017","CONSTRUCTION OF FLOOD CONTROL AT PALILAN RIVER , PALILAN JUMBO BRIDGE ALONG OZAMIZ CITY - OROQUIETA CITY ROAD, JIMENEZ, MISAMIS OCCIDENTAL","Flood Control and Drainage","Completed",46548564.57,0,100,"Misamis Occidental 1st DEO","Region X","MINDANAO ROCK (23479)","2018-04-16","2019-06-30",2018,"Regular Infra - GAA 2018 OO-2",8.33552,123.84897,"1004207000","1004200000"]
SHA-256
832952e00cd5a41a45a2e128da18680d1c4b1a5e4cb89bd90c8a511a8e0bd5c6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.