Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18LB0081

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18LB0081","INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER BASIN WAAN FLOOD CONTROL, STA. 17+789-STA. 18+387 RIGHT BANK, DAVAO CITY","GAA 2018 OO-2","Completed",60795000,0,100,"Davao City DEO","Region XI","A.Y.U. ENGINEERING & CONSTRUCTION (25632) / DIGOS TESSTON CONST. & SUPPLIES (8921)","2018-06-10","2019-01-09",2018,"Regular Infra - GAA 2018 OO-2",7.12339,125.59502,"1130700000","1102400000"]
SHA-256
7a10b996d2236a3ba2d4c86d4a0ad50d1cedb403a759203c578e79e0e6b26ec5

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.