Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18LB0238

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18LB0238","CONSTRUCTION OF 4 STOREY 12 CLASSROOM SCHOOL BUILDING, DR. SANTIAGO DAKUDAO SR. NATIONAL HIGH SCHOOL DAVAO CITY","Buildings and Facilities","Completed",34070564.13,0,100,"Davao City DEO","Region XI","ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196)","2018-08-12","2019-08-21",2018,"Outside Infra - GAA 2018 DepEd BEFF",7.16064,125.64306,"1130700000","1102400000"]
SHA-256
70b66723bf0c1d5c413e65c2c707ac310285ef1a8efd2c74d5367ef07977709d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.