Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18LF0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18LF0029","CONSTRUCTION OF REVETMENT ON STEEL SHEET PILES FOUNDATION, MAGLAHUS, CATEEL, DAVAO ORIENTAL","Flood Control and Drainage","Completed",30771346.51,0,100,"Davao Oriental 1st DEO","Region XI","RUPLINO SEISMUNDO CONSTRUCTION CORPORATION (FORMERLY: R.R. SEISMUNDO CONSTRUCTION & SUPPLY) (10961)","2018-03-20","2019-03-08",2018,"Regular Infra - GAA 2018 OO-2",7.7491,126.31416,"1102505000","1102500000"]
SHA-256
04abb6fbab0829ca67c914ed42afda68b91ada4a4350ef8b2eb3330f799280e9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.