Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18MA0014

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18MA0014","CONSTRUCTION OF ESTEROS BRIDGE, RIPRAP/RIVERBANK PROTECTION OF BRGY. ROSARY HEIGHTS 10, (TOWARDS BRGY. BAGUA), COTABATO CITY","Flood Control and Drainage","Completed",47457341.02,0,100,"Cotabato City DEO","Region XII","GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044)","2018-07-11","2020-03-01",2018,"Regular Infra - GAA 2018 OO-2",7.1954,124.23278,"1908703000","1908700000"]
SHA-256
706befc1ff5439206987cf03f4821d66d3f23f6c0b022eff1684f198c9cd8612

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.