Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18MA0095

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18MA0095","CONSTRUCTION OF KAKAR RIPRAP/RIVERBANK PROTECTION OF BRGY. POBLACION 8 (RIGHT SIDE), COTABATO CITY","Flood Control and Drainage","Completed",47533378.3,0,100,"Cotabato City DEO","Region XII","GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON (5044)","2018-12-12","2019-09-30",2018,"Regular Infra - GAA 2018 OO-2",7.19802,124.24913,"1908703000","1908700000"]
SHA-256
250b6e474f3fd71783362fc031a2fdcd846242756a5bbd55b5d4562f353d0d92

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.