Project 18MB0021
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-18MB0021",
"title": "CONSTRUCTION OF SILWAY RIVER BANK PROTECTION AT LOWER KLINAN-MABUHAY, (SILWAY RIVER BASIN), STA. 0+000-STA.0+038, BRGY. MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO",
"sector": [
"Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH South Cotabato 1st DEO"
},
"period": {
"startDate": "2018-03-27",
"endDate": "2018-12-28"
},
"budget": {
"amount": {
"amount": 41018398.65,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
125.13897,
6.18781
]
}
}
],
"parties": [
{
"name": "JANMERC BUILDERS (42291) / LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "18MB0021",
"summary": {
"title": "CONSTRUCTION OF SILWAY RIVER BANK PROTECTION AT LOWER KLINAN-MABUHAY, (SILWAY RIVER BASIN), STA. 0+000-STA.0+038, BRGY. MABUHAY, GENERAL SANTOS CITY, SOUTH COTABATO",
"status": "closed",
"contractValue": {
"amount": 41018398.65,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "9d8938c5c277616fabb32280d16b0d874062e9f719e134b8c1a2c1eaaade39cd"
}
}