Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18MC0106

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18MC0106","CONSTRUCTION OF MARBEL RIVER FLOOD CONTROL, MATALAM, NORTH COTABATO STA. 4+077-STA. 4+401 L=324 LM RIGHT BANK","Flood Control and Drainage","Completed",29399000,0,100,"Cotabato 2nd DEO","Region XII","JARGON CONSTRUCTION & SUPPLY (23474)","2018-02-26","2018-12-08",2018,"Regular Infra - GAA 2018 OO-2",7.11523,124.92408,"1204708000","1204700000"]
SHA-256
01b47363be58a0e7eac724080a6e4f33c010e08f0ca0f493a3ab18a1db18ad20

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.