Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18ME0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18ME0028","CONST. OF RIVER BANK PROTECTION W/ REVETMENT ALONG MATLING RIVER (SAUB BRIDGE SECTION), MAITUM, SARANGANI PROVINCE","Flood Control and Drainage","Completed",9798378.72,0,100,"Sarangani DEO","Region XII","FREDEN CONSTRUCTION (22665)","2018-02-25","2018-07-05",2018,"Regular Infra - GAA 2018 OO-2",6.05723,124.49872,"1208005000","1208000000"]
SHA-256
af66a8072ea33e110bd37ca6cb64ed817f97f2b99d1f33e38dbee4d6ace2dfc9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.