Project 18ME0040
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-18ME0040",
"title": "WIDENING OF TUYAN BRIDGE (B01049MN) ALONG SDSCR, MALAPATAN, SARANGANI PROVINCE",
"sector": [
"Bridges: Construction - Concrete (Superstructure) - with Driven Piles, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices)"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Sarangani DEO"
},
"period": {
"startDate": "2018-03-11",
"endDate": "2018-11-30"
},
"budget": {
"amount": {
"amount": 32831022.39,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
125.29164,
6.00236
]
}
}
],
"parties": [
{
"name": "GRECO CONSTRUCTION AND SUPPLY (21884) / P.B. OBIAL CONSTRUCTION",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "18ME0040",
"summary": {
"title": "WIDENING OF TUYAN BRIDGE (B01049MN) ALONG SDSCR, MALAPATAN, SARANGANI PROVINCE",
"status": "closed",
"contractValue": {
"amount": 32831022.39,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - Bridges: Construction - Concrete (Superstructure) - with Driven Piles, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices)",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "f6de6700d59cc227779967765597ee906b15a74339758dfa99c47e44205f9194"
}
}