Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18NA0002

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18NA0002","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONSTRUCTION/IMPROVEMENT OF GUIHAO-AN RIVER BANK PROTECTION ALONG GUIHAO-AN BRIDGE WITH RECHANNELIZATION, BUENAVISTA, AGUSAN DEL NORTE","Flood Control and Drainage","Completed",25945125.8,0,100,"Agusan del Norte DEO","Region XIII","ROIM BUILDERS & CONSTRUCTION SUPPLY (20226)","2018-04-01","2018-10-13",2018,"Regular Infra - GAA 2018 OO-2",8.97223,125.39961,"1600201000","1600200000"]
SHA-256
eb999774ab19793abc4903e635d69c8262a1b3b43d72e4c38bdd38c8b00ae665

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.