Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18NC0044

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18NC0044","CONSTRUCTION OF BANK PROTECTION OF SIMULAO RIVER, PROTECTING ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECTION) INCL ROW 0+000 - 0+110, BUNAWAN, AGUSAN DEL SUR","Flood Control and Drainage","Completed",48800000,0,100,"Agusan del Sur 2nd DEO","Region XIII","ADFIL CORPORATION (14437)","2018-05-07","2018-12-26",2018,"Regular Infra - GAA 2018 OO-2",8.11326,126.02419,"1600312000","1600300000"]
SHA-256
ccb3a2d08604779c4a1825594d5e07739bb2dfdeb9ad21f207a7d0537c9a93d4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.