Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18NF0002

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18NF0002","CONSTRUCTION OF LISONDRA SEAWALL/BRGY. LISONDRA, SURIGAO CITY, STA.0+000 - 0+274.8 LEFT","Flood Control and Drainage","Completed",39040301.1,0,100,"Surigao del Norte 2nd DEO","Region XIII","GICAR CONSTRUCTION, INC. (12624)","2018-05-10","2019-10-16",2018,"Regular Infra - GAA 2018 OO-2",9.88152,125.56518,"1606724000","1606700000"]
SHA-256
5af515ddfcd076afc9fabfbef1306eb216dcd6e781f84e3607a2de0e66a25ac3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.