Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18NF0007

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18NF0007","CONSTRUCTION OF RIVER CONTROL/BRGY. CAWILAN, TUBOD, SURIGAO DEL NORTE, STA.0+000 - 0+027.50","Flood Control and Drainage","Completed",1903795.85,0,100,"Surigao del Norte 2nd DEO","Region XIII","LVRO CONSTRUCTION & SUPPLY (18116)","2018-03-14","2018-07-01",2018,"Regular Infra - GAA 2018 LP",9.54981,125.57924,"1606727000","1606700000"]
SHA-256
7f1b479f6aa0169ce592e203246fb9d20b50890e27b331cde060f17e19d55f71

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.