Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18NF0017

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18NF0017","CONSTRUCTION OF RIVER CONTROL/BRGY. SAN PABLO, TUBOD, SURIGAO DEL NORTE, STA.0+008 - 0+101.00","Flood Control and Drainage","Completed",1919174.3,0,100,"Surigao del Norte 2nd DEO","Region XIII","C.V. CONSTRUCTION & DEVELOPMENT (8334)","2018-04-24","2018-11-11",2018,"Regular Infra - GAA 2018 LP",9.55338,125.56662,"1606727000","1606700000"]
SHA-256
120ab9ab1868c1961b409e1b357ef7596174b9fba383f556b1defc767b3fbd11

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.