Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 18NH0021

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","18NH0021","CONSTRUCTION OF SAN PEDRO SEAWALL, CANTILAN, SURIGAO DEL SUR","Flood Control and Drainage","Completed",32584905.09,0,100,"Surigao del Sur 1st DEO","Region XIII","GICAR CONSTRUCTION, INC. (12624)","2018-04-11","2018-10-20",2018,"Regular Infra - GAA 2018 OO-2",9.36567,125.94565,"1606807000","1606800000"]
SHA-256
e1cb0c0790392b1861eabd771dfd5c8bad7d0d676036111e9ae2efb8dae3116e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.